Today’s news:

The changing face of Sheepshead Bay

City: We'll build a new park, but won't fix the broken down pier

Brooklyn Daily

The Parks Department will transform an empty lot at the foot of Brigham Street into a lush park with sweeping waterfront views, but won’t fix a dilapidated city-owned pier next to it that local fishermen fear will crumble into the sea.

“The pier’s in bad shape,” said Jora Vaneshvele, who often fishes at the L-shaped pier at the foot of Brigham Street, risking life and limb for a fresh fluke. “They need to rebuild it.”

The entrance to the pier — which is adjacent to the proposed parkland near the Belt Parkway on-ramp — is littered with garbage. The pier’s awning is torn, sections of railing are missing, and the boards are littered with gaping holes.

Residents said the worn-down walkway is a serious safety hazard to anyone who dares to traverse it.

“Somebody is going to fall through the planks and drown,” said Ed Eisenberg.

Councilman Lew Fidler (D–Marine Park), who pushed to have the park built, said the pier should be fixed before the $4-million greenspace opens and visitors flock to the area. He’s proposing that the city spend up to $1 million to rehab the pier and add a fish-cleaning station.

“We should spruce up the pier and make it a little nicer and safer because we’re inviting people to go there,” Fidler said.

Yet a Parks Department spokesman said fixing up the pier isn’t part of the Brigham Street park project — and wouldn’t provide further details.

A spokesman for the Department of Environmental Protection, which is in charge of the pier’s upkeep, did not return calls seeking comment.

In February, the Parks Department revived a 20-year-old plan to turn the weed-strewn lot near Emmons Avenue — which is slightly larger than a football field — into the public park residents have been demanding since the 1990s.

Planners initially wanted a 21st-century oasis with high-tech equipment, but the final design is more bare-bones and will include nothing more than grass, a few pathways, benches, and a view of Sheepshead Bay.

The park also won’t have waterfront access or bathrooms, though Park officials said rest rooms could be built in the future for an additional $1.6 million.

Reach reporter Daniel Bush at dbush@cnglocal.com or by calling (718) 260-8310. Follow him at twitter.com/dan_bush.

Pin It
Print this story Permalink

Reader Feedback

Bea K. from Bushwick says:
Here we go again, first the Abbracciamento Restaurant on the Canarsie Pier, now this? They could fix up this pier and use boats to take folks out on the water, hasn't anyone thought of that, it could make extra money for the city. This is crazy folks.
Sept. 9, 2013, 10:27 am

Enter your comment below

By submitting this comment, you agree to the following terms:

You agree that you, and not BrooklynDaily.com or its affiliates, are fully responsible for the content that you post. You agree not to post any abusive, obscene, vulgar, slanderous, hateful, threatening or sexually-oriented material or any material that may violate applicable law; doing so may lead to the removal of your post and to your being permanently banned from posting to the site. You grant to BrooklynDaily.com the royalty-free, irrevocable, perpetual and fully sublicensable license to use, reproduce, modify, adapt, publish, translate, create derivative works from, distribute, perform and display such content in whole or in part world-wide and to incorporate it in other works in any form, media or technology now known or later developed.

CNG: Community Newspaper Group